The biggest project in improving what we bought was the major restoration we carried out. Some of which is shown below. This apart from adding a new coronation for the pool and re-tiling the whole swimming pool area. Another later project was installing a storm drain behind the house as in ‘gota frias’ our kitchen always flooded
All of the roofs were taken off and replaced while we lived here. Very weird and here is an example
How the kitchen looked when we bought the house
Chester supervising Granada courtyard work
The original back entrance and Granada courtyard
This was part of the Cordoba terrace. We built in the footprint of the old log store a wardrobe for our bedroom- A master move.Original logstorage
This is part of Cordoba in it's rough state before we tiled, installed steps and a fountain